Roof Installation Timeline: How Long Does a New Roof Really Take?

Roof Installation Timeline: What Homeowners Should Expect From Start to Finish

Installing a new roof is one of the most important investments a homeowner can make. It strengthens your home, improves energy efficiency, and increases long-term value. But one of the most common questions homeowners ask is:

“How long will the installation take?”

The answer depends on several factors — including home size, materials, weather, and the complexity of the roof — but with Cherry Roofs, most installations are completed in 1–3 days.

Below is a complete breakdown of the process so you know exactly what to expect.

Day 1: Home Protection, Tear-Off & Decking Inspection

The first day is all about preparation and making sure your home is protected.

Home Protection

We begin by covering landscaping, windows, AC units, and surrounding areas to ensure nothing is damaged during the tear-off.

Tear-Off of the Old Roof

The old shingles or metal panels are removed carefully. This allows us to assess the condition of the roof underneath — something that cannot be done with overlays.

Decking Inspection

We check for:

  • Rot
  • Weak wood
  • Warped panels
  • Moisture damage

If any decking needs replacement, we fix it immediately to ensure a solid foundation for your new roof.

Day 2: Underlayment, Flashing & Material Installation

This is when your new roof truly begins to take shape.

Underlayment Installation

The waterproof underlayment is installed to protect the home from leaks and water infiltration. This layer is crucial for long-term durability.

Flashing Replacement

We replace all flashing around chimneys, skylights, vents, and transitions. High-quality flashing prevents leaks and ensures proper water flow.

Installing Shingles or Metal Panels

Depending on your chosen material:

  • Shingles are installed row by row
  • Metal panels are secured and sealed
  • Tile roofs begin the fastening and alignment stage
  • This is often the longest part of the installation.
Day 3: Final Installation, Sealing, Cleanup & Quality Inspection

By the final day, your home begins to look completely transformed.

Finishing Installation

We complete the placement of materials, seal all edges, and reinforce vulnerable areas.

Thorough Cleanup

All debris, nails, and materials are removed from your property. We use magnetic sweepers to ensure safety.

Final Quality Check

We perform a complete inspection, ensuring that:

  • All materials are properly installed
  • There are no gaps or vulnerabilities
  • Ventilation is correct
  • Flashing is sealed
  • Roof lines are aligned

Only after everything passes our quality standards is the project considered complete.

A Smooth Process Starts With the Right Roofing Team

Roof installation doesn’t have to be stressful. When handled by professionals, the process is smooth, efficient, and predictable. At Cherry Roofs, we make sure homeowners feel informed and confident every day of the installation.

Your home deserves reliable protection — and your family deserves peace of mind.

📞 Schedule your roof installation consultation: (833) 54-CHERRY